A biofiltration swale is to be laid on a 2% slope to handle a design peak runoff rate equal to 0.002 m³/s. During the wet season, the swale is expected to be covered with grass having an average height of 100 mm and Class E retardance. Design the swale.

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter16: Highway Drainage
Section: Chapter Questions
Problem 10P
icon
Related questions
Question
A biofiltration swale is to be laid on a 2% slope to handle a design peak runoff rate equal to
0.002 m³/s. During the wet season, the swale is expected to be covered with grass having an
average height of 100 mm and Class E retardance. Design the swale.
Transcribed Image Text:A biofiltration swale is to be laid on a 2% slope to handle a design peak runoff rate equal to 0.002 m³/s. During the wet season, the swale is expected to be covered with grass having an average height of 100 mm and Class E retardance. Design the swale.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps

Blurred answer
Knowledge Booster
Runoff
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning