Auto pistons at Wemming Chung's plant in Shanghai are produced in a forging process, and the diameter is a critical factor that must be controlled. From sample sizes of 10 pistons produced each day, the mean and the range of this diameter have been as follows: Range R (mm) Mean x Day (mm) 1 158.9 4.2 2 155.2 4.6 3 155.6 4.3 4 157.5 5.2 156.6 4.7 What is the UCL of the range chart using 3-sigma? (round your response to two decimal places).

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
回新索引標
Dashbo.
a Site: BUS
a BUS2016
POE BUS2016
Tutorial
PDF Tutorial
8 Take X
PDE 7 Proces
PDF 6 Statist
PDE 5 Manac
po 4 Design
b My Ques - m
BUS201
2021 ye +
ô https://moodle.uowplatform.edu.au/mod/quiz/attempt.php?attempt=4708025&cmid=1946207&page=8
Auto pistons at Wemming Chung's plant in Shanghai are produced in a forging process, and the diameter is a critical factor that must be
controlled. From sample sizes of 10 pistons produced each day, the mean and the range of this diameter have been as follows:
Range R
(mm)
Mean x
Day
(mm)
1
158.9
4.2
2
155.2
4.6
3
155.6
4.3
4
157.5
5.2
156.6
4.7
What is the UCL of the range chart using 3-sigma? (round your response to two decimal places).
Answer:
15:18
o在這裡輸入文字來搜尋
后)英
22/3/2021
Transcribed Image Text:回新索引標 Dashbo. a Site: BUS a BUS2016 POE BUS2016 Tutorial PDF Tutorial 8 Take X PDE 7 Proces PDF 6 Statist PDE 5 Manac po 4 Design b My Ques - m BUS201 2021 ye + ô https://moodle.uowplatform.edu.au/mod/quiz/attempt.php?attempt=4708025&cmid=1946207&page=8 Auto pistons at Wemming Chung's plant in Shanghai are produced in a forging process, and the diameter is a critical factor that must be controlled. From sample sizes of 10 pistons produced each day, the mean and the range of this diameter have been as follows: Range R (mm) Mean x Day (mm) 1 158.9 4.2 2 155.2 4.6 3 155.6 4.3 4 157.5 5.2 156.6 4.7 What is the UCL of the range chart using 3-sigma? (round your response to two decimal places). Answer: 15:18 o在這裡輸入文字來搜尋 后)英 22/3/2021
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Quality Process Control
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.