Problem 5 Shelves Unlimited is interested in estimating the additional machine center capacities for a new Book Shelf. The shelf is made from two end panels, three shelves plus a number of various fasteners and hangers. Fabrication is as follows: End Panel: Shelf: Operation Machine Run Time (per unit) 123 LN3+ 1 2 3 Operation Machine 1 2 3 Saw Planer 2 minutes Router 4 Saw Molder Router Sander 5 minutes 3 minutes Run Time (per unit) 2 minutes 3 minutes 4 minutes 1 minute Setup Time Per Operation .8 hours .1 hours .8 hours Setup Time Per Operation .3 hours 1.2 hours .7 hours .1 hours A. If Shelves Unlimited makes a batch of 250 Book Shelves (complete units, e.g. sides and side panels), how much time will be required on the Router? B. If it takes 34 hours of molding machine time to complete a batch of 250 Book Shelves (complete units, e.g. sides and side panels), what would be the efficiency of the moulding operation?

Elements Of Electromagnetics
7th Edition
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Sadiku, Matthew N. O.
ChapterMA: Math Assessment
Section: Chapter Questions
Problem 1.1MA
icon
Related questions
Question
Please solve it complete please don't copy paste
Problem 5 Continued –
C. Management is considering producing these parts by setting up two separate assembly
lines one dedicated to the production of End Panels and the other to the production of
Shelves as follows:
End Panel
Shelf
Station Task Time
Station
Task Time
1 Saw
5 min.
1 Saw
2 min.
2 Plane
2 min.
2 Mold
3 min.
3 Router
3 min.
3 Router
4 min.
4. Sander
2 min.
If each assembly line (one worker at each station) is run one, 8-hour shift per day,
enough parts will be produced in one day to assemble how many book shelves?
Transcribed Image Text:Problem 5 Continued – C. Management is considering producing these parts by setting up two separate assembly lines one dedicated to the production of End Panels and the other to the production of Shelves as follows: End Panel Shelf Station Task Time Station Task Time 1 Saw 5 min. 1 Saw 2 min. 2 Plane 2 min. 2 Mold 3 min. 3 Router 3 min. 3 Router 4 min. 4. Sander 2 min. If each assembly line (one worker at each station) is run one, 8-hour shift per day, enough parts will be produced in one day to assemble how many book shelves?
Problem 5
Shelves Unlimited is interested in estimating the additional machine center capacities for a new Book Shelf. The shelf is
made from two end panels, three shelves plus a number of various fasteners and hangers. Fabrication is as follows:
End Panel:
Operation Machine
Run Time (per unit)
Setup Time Per Operation
1
Saw
5 minutes
.8 hours
2
Planer
2 minutes
.1 hours
3
Router
3 minutes
.8 hours
Shelf:
Operation Machine
Run Time (per unit)
Setup Time Per Operation
1
Saw
2 minutes
.3 hours
2
Molder
3 minutes
1.2 hours
3
Router
4 minutes
.7 hours
4
Sander
1 minute
.1 hours
A. If Shelves Unlimited makes a batch of 250 Book Shelves (complete units, e.g. sides and side panels), how much time
will be required on the Router?
If it takes 34 hours of molding machine time to complete a batch of 250 Book Shelves (complete units, e.g. sides and
side panels), what would be the efficiency of the moulding operation?
В.
Transcribed Image Text:Problem 5 Shelves Unlimited is interested in estimating the additional machine center capacities for a new Book Shelf. The shelf is made from two end panels, three shelves plus a number of various fasteners and hangers. Fabrication is as follows: End Panel: Operation Machine Run Time (per unit) Setup Time Per Operation 1 Saw 5 minutes .8 hours 2 Planer 2 minutes .1 hours 3 Router 3 minutes .8 hours Shelf: Operation Machine Run Time (per unit) Setup Time Per Operation 1 Saw 2 minutes .3 hours 2 Molder 3 minutes 1.2 hours 3 Router 4 minutes .7 hours 4 Sander 1 minute .1 hours A. If Shelves Unlimited makes a batch of 250 Book Shelves (complete units, e.g. sides and side panels), how much time will be required on the Router? If it takes 34 hours of molding machine time to complete a batch of 250 Book Shelves (complete units, e.g. sides and side panels), what would be the efficiency of the moulding operation? В.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 17 images

Blurred answer
Knowledge Booster
Applied Fluid Mechanics
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Elements Of Electromagnetics
Elements Of Electromagnetics
Mechanical Engineering
ISBN:
9780190698614
Author:
Sadiku, Matthew N. O.
Publisher:
Oxford University Press
Mechanics of Materials (10th Edition)
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:
9780134319650
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Thermodynamics: An Engineering Approach
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:
9781259822674
Author:
Yunus A. Cengel Dr., Michael A. Boles
Publisher:
McGraw-Hill Education
Control Systems Engineering
Control Systems Engineering
Mechanical Engineering
ISBN:
9781118170519
Author:
Norman S. Nise
Publisher:
WILEY
Mechanics of Materials (MindTap Course List)
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:
9781337093347
Author:
Barry J. Goodno, James M. Gere
Publisher:
Cengage Learning
Engineering Mechanics: Statics
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:
9781118807330
Author:
James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:
WILEY