Question Question: if you know that, a Loop levelling started and ended on known benchmarks (BM 1073 and BM 1074) as shown below. There are 3 instrument locations (L1, L2, L3) and 2 change points (D, G). Additionally, there are 5 intermediate sight points (A, B, C, E, F). The staff readings are presented on the sketch below. The elevation of BM 1073 is equal to 15.452m. Calculate the reduced level of all unknown points (A, B, C, D, E, F, G, and BM 1074) using the Height of the instrument method and the Rise and Fall method? Present your work in two separate tables. B F 0.9070 AQ 0.87X E Q0.808 0.765 2.005 1.322 1.805 1.904 1.090 L2 G 2.355 BM 1073 15.452m L, 1.411 L3 C BM 1074

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Question
Question: if you know that, a Loop levelling started and ended on known benchmarks (BM 1073
and BM 1074) as shown below. There are 3 instrument locations (L1, L2, L3) and 2 change points
(D, G). Additionally, there are 5 intermediate sight points (A, B, C, E, F). The staff readings are
presented on the sketch below. The elevation of BM 1073 is equal to 15.452m.
Calculate the reduced level of all unknown points (A, B, C, D, E, F, G, and BM 1074)
using the Height of the instrument method and the Rise and Fall method? Present
your work in two separate tables.
B
F
0.9070
AQ
0.87X
E
Q0.808
0.765
2.005
1.322
1.805
1.904.
1.090
L2
G
2.355
BM 1073
15.452m
D
1.411
L3
C
BM 1074
Transcribed Image Text:Question Question: if you know that, a Loop levelling started and ended on known benchmarks (BM 1073 and BM 1074) as shown below. There are 3 instrument locations (L1, L2, L3) and 2 change points (D, G). Additionally, there are 5 intermediate sight points (A, B, C, E, F). The staff readings are presented on the sketch below. The elevation of BM 1073 is equal to 15.452m. Calculate the reduced level of all unknown points (A, B, C, D, E, F, G, and BM 1074) using the Height of the instrument method and the Rise and Fall method? Present your work in two separate tables. B F 0.9070 AQ 0.87X E Q0.808 0.765 2.005 1.322 1.805 1.904. 1.090 L2 G 2.355 BM 1073 15.452m D 1.411 L3 C BM 1074
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
Methods of Surveying
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning