Scenario “A car manufacturer produces two versions of its popular medium sized model: a hatchback aimed at the family market and a coupe designed to appeal to affluent single customers. Both are based on the same chassis and differ only in the body kit used to make up the cars. They are both produced at the same factory. There are 95,000 hours of manpower and 8,900 basic chassis units (one per vehicle) available each week. The hatchback takes 4 hours of assembly time while a coupe takes 6.5 hours. At least 1,000 coupe models should be produced per week. Production is also constrained by the fact that owing to problems with a supplier only 34,000 door handles are available per week. A hatchback uses ten of these handles while a coupe uses four. The profit to the factory on a hatchback model is estimated to be £3,450 while the profit on a coupe is £975. The market demand for the cars is high. It is known that demand will exceed production for time to come so they should be able to sell whatever mix of cars is produced. The car manufacturer wants to maximise its profits, but doesn’t know what combination of versions of its medium-sized model to produce.” Remember to deal with negativity constraints, if necessary!  Linear Programming

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question

Scenario
“A car manufacturer produces two versions of its popular medium sized model: a
hatchback aimed at the family market and a coupe designed to appeal to affluent
single customers.
Both are based on the same chassis and differ only in the body kit used to make
up the cars. They are both produced at the same factory.
There are 95,000 hours of manpower and 8,900 basic chassis units (one per
vehicle) available each week. The hatchback takes 4 hours of assembly time
while a coupe takes 6.5 hours.
At least 1,000 coupe models should be produced per week.
Production is also constrained by the fact that owing to problems with a supplier
only 34,000 door handles are available per week. A hatchback uses ten of these
handles while a coupe uses four.
The profit to the factory on a hatchback model is estimated to be £3,450 while the
profit on a coupe is £975.
The market demand for the cars is high. It is known that demand will exceed
production for time to come so they should be able to sell whatever mix of cars is
produced.
The car manufacturer wants to maximise its profits, but doesn’t know what
combination of versions of its medium-sized model to produce.”
Remember to deal with negativity constraints, if necessary! 

Linear Programming

Expert Solution
steps

Step by step

Solved in 5 steps with 31 images

Blurred answer
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,